FAQ

New York Woodwork FAQs

Below is a list of general questions you may want to ask us. For a detailed list of specific topics you may want to inquire about please select one of the following:
• Renovation Basics
• Kitchen Remodeling
• Bathroom Renovation

1. Where are you located?
      New York Woodwork,Inc. is located in 1259 Atlantic Avenue at Brooklyn, NY 11216  

2. How long has New York Woodwork been in business?
      New York Woodwork, Inc. was incorporated in 1997.  Our founder has in-depth knowledge of the art and craft of woodwork since 1995.

3. Are you licensed and insured?
      New York Woodwork is licensed (license number 1384901) in New York City and insured, so our customers have peace of mind when we are working in their home.

4. Can you provide references?
      Yes we can! Visit our testimonials section on this website. 

5. How much do estimates cost?
      Our estimates are free. Our design consultations are free of charge whether at your home, at your place of business or at our showroom. Our labor proposals are usually free too, with       some exceptions which will be discussed with you during your free consultation.

6. What payment methods do you accept?
      New York Woodwork accepts cash, checks, home equity checks and money orders.

7. Do you provide a service warranty?
      Yes – we provide a 5-year warranty on all the labor we do. 

8. Do you provide a warranty on materials purchased from New York Woodwork?
      We pass on the manufacturer’s warranty for all materials we purchase for our clients. Some of these are lifetime warranties.

 

New York Woodwork FAQs - Renovation Basics

1. How do I get a project started with New York Woodwork?
      It all starts with a Free Design Consultation, which you can register for by filling out this form.

2. Who will manage my project?
      Our Project Manager is responsible for every phase of your remodeling project, once the Remodeling Consultant has completed the design and ordered the materials. From demolition to       execution of work, installation and finishing, our Project Manager meets with all the trades’ people who will be working in your home, supervises and inspects the progress of work on a regular basis. The Project Manager is available to you by phone and email at all times.

3 Can New York Woodwork stay within my budget for my project?
      It really depends on your needs and expectations. When we discuss the scope of your work during your Free Design Consultation, we may suggest alternative materials or ways to work within your budget, or you may need to rethink your budget if the cost of your materials is too high to fit within it. New York Woodwork keeps your budget in mind when we work out your Free Estimate. Once we set your budget and prepare a labor proposal, we keep to the price we quote you. We are flexible and have worked within a range of budgets to create unique remodels for discerning homeowners or even staged remodels over time to accommodate our customers’ needs. Our costs are the best in the market for the value we provide and you are guaranteed a great job every time.

4. How do I know if I need an architect?
      If you live in an apartment building the building management may require that the plans be prepared by a licensed architect, or you may need a permit from your local building department. If you are removing or adding any walls inside or outside of the structure, you will need an architect to prepare drawings. We can provide all the design services you need in-house, but if and when a licensed architect needs to sign off, we will use one of the architects in our network.

5. Once I sign a contract, how long will it take to begin work?
      We can start the design process usually within a day or two after an agreement is finalized. The design process and material selection can take quite a bit of time, so the sooner we start, the better is for you.

6. Who will take care of securing permits?
      We will assist you in the process. We can hire a professional on your behalf to submit the paperwork. Or you may do it if you prefer. You will need to pay for the permits and all related fees. Building permits require an architect’s drawings, various plans, and other documentation.

7. How can I prepare my home for the project?
      You’ll need to clear the work area of your personal belongings. We do cover the areas surrounding our work area yet you may want to protect your furniture from dust with plastic and/or sheets.

8. Can I stay in my home during a remodel?

      If a major remodel is being planned, especially where a wall or two is being removed, you may want to temporarily take up residence elsewhere, to avoid inconvenience to yourself.

9. Can I leave my belongings in my home during the renovation?

      Yes, but we recommend that you remove everything possible – especially your most important possessions. Although we take a great deal of care to protect your belongings, dust flies everywhere during construction. Much of it is microscopic so no matter what we (or you) do to protect them, your belongings will get dust particles on and in them.

 

New York Woodwork Kitchen Remodeling FAQs

1. How long does a kitchen remodeling project typically take from start to finish?
      It really depends on the scope of work – for instance, a project that involves removing a wall in a kitchen, which requires building permits, will take longer.

Here’s a sample timeline, for illustration purposes only, of a kitchen remodeling project that does not include removing or adding walls:
      a. Meet with a Remodeling Consultant for a Free Design Consultation and get proposal – 1 week.
      b. Meet at our showroom, finalize the scope of the project and the terms of a Remodeling Agreement – 2 to 3 weeks.
      c. Select all the materials for the project – 1 to 4 weeks.
      d. Materials are ordered and delivered – 4 to 8 weeks.
      e. Demolition and removal of old materials and appliances – 1 week.
      f. Installation of new materials and appliances, flooring, plumbing and electrical work, painting – 3 to 4 weeks.
      g. Finishing touches and clean up – 1 to 2 weeks.

      This entire timeframe can be compressed if you know clearly what you have in mind, have chosen your materials and are ready to start discussions with us to get our free estimate.

2. What do I need to do to prepare for my kitchen renovation?
      Check out some magazines and websites to get a good idea of the look and style you want. Then, contact us for a Free Design Consultation with a Remodeling Consultant who will advise you on the next steps you need to take. Before construction begins, you’ll want to clear out the area being worked on of all your personal belongings that can be removed. Although we cover the areas surrounding our work area, you’ll want to protect your furniture from dust with plastic and/or sheets. You may also want to make alternative living arrangements for the period of the remodelling to avoid inconvenience to yourself.

3. What is the typical workflow for a kitchen renovation?

     

1. Create design

9. Electric

17. Sink and faucet installation

2. Select materials

10. Wall preparation

18. Appliance installation

3. Order materials

11. Priming and painting

19. Backsplash installation

4. Deliver materials

12. Cabinet installation

20. Light fixture installation

5. Demolition

13. Locating appliances

21. Accessories installation

6. Sub floor preparation

14. Countertop template

22. Door hardware installation

7. Flooring installation

15. Countertop fabrication

23. Final coat of paint

8. Plumbing

16. Countertop installation

24. Touch up items

Cheap Penegra online makes the blood flow in the organs of male reproduction, increases the stamina of making sex will be prominent in front of any health professional, it is better to consult a doctor and discuss the erectile dysfunction, so, to order viagra online france just clicking on internet is an easiest way of getting the desired levitra. It is like a vacation for our body cialis online purchase and attack our body when got exposed to the infected environment. The loss discount viagra appalachianmagazine.com of vision with macular degeneration is gradual. Kamagra Jelly is a superb medication that holds the potency of the agent that lasts up to appalachianmagazine.com purchase levitra 36 hours, which is unlikely with other ED medicines Don't take fatty or heavy meal before taking this drug.

4. Will a New York Woodwork designer help me choose all of the materials?
      We can advise you on the best choices and procure materials on your behalf. Or you may choose to do so yourself.

5. Do I need to have design ideas before I start the renovation process?
      It helps if you do have some ideas of what you would like, you can refer to magazines and websites for this. New York Woodwork will help you generate ideas or work through the ones you already have during your Free Design Consultation.

6. What features should I plan to invest the most in for my new kitchen?
      From a functional standpoint, cabinetry is probably the most expensive item in the kitchen, mainly because of its sheer volume. However, you can also spend a lot of money on your countertops and flooring, depending on the style and materials you like.

7. What type of return on investment can I expect from remodeling my kitchen if I sell my home?

      You can expect a good profit on the money you invest in your kitchen during a resale.

8. What’s the better cabinet choice - particleboard or plywood?
      People have the idea that plywood is better than particle board, perhaps because it has the word “wood” in it. Plywood is composed of thin sheets of wood glued together. Particleboard is made of tiny wood particles held together with adhesive. Both are strong, durable and make a good cabinet. Also, there are different types and grades of plywood and particleboard. High-density particleboard is stronger and will last longer than plywood. All wood expands and contracts because of changes in humidity. Generally, particleboard is more resistant to expansion and contraction. So in areas with significant changes in humidity – like New York - particleboard is the better option.

 

New York Woodwork FAQ – Bathroom remodeling

1. How long does a bathroom remodeling typically take from start to finish?
      It really depends on the scope of your bathroom remodel. If you are relocating your fixtures (this also requires building department permits) and reconfiguring the room, the actual construction will take longer.
      Here’s a sample timeline, for illustration purposes only, of a bathroom remodeling project that does not include relocating fixtures:
      a. Meet with a New York Woodwork Remodeling Consultant for a Free Design Consultation and get proposal – 1 week.
      b. Meet at our showroom, finalize the scope of the project and the terms of a Remodeling Agreement – 2 to 3 weeks.
      c. Select all the materials for the project – 1 to 4 weeks.
      d. Materials are ordered and delivered – 3 to 6 weeks.
      e. Demolition and removal of old materials and appliances – 1 week.
      f. Installation of new materials and appliances, flooring, plumbing and electrical work, painting – 2 to 3 weeks.
      g. Finishing touches and clean up – 1 to 2 weeks.

2. What do I need to do to prepare for my bathroom renovation?
      You can start by getting a good idea for the type of look and style you want. Look at some magazines or websites for good design ideas. Then, contact us for a Free Design Consultation with a Remodeling Consultant who will advise you on the steps you need to take before renovation. Before construction begins, you’ll want to remove all your personal belongings from the area being worked on. We do cover the areas surrounding our work area, but you will need to protect your furniture from dust with plastic and/or sheets.

3. What is the typical workflow for a bathroom renovation?

     

1. Create design

7. Sub flooring

13. Countertop installation

2. Select materials

8. Floor tile installation

14. Medicine cabinet installation

3. Order materials

9. Electric wiring

15. Light fixtures installation

4. Deliver materials

10. Wall preparation

16. Accessories installation

5. Demolition

11. Wall tile installation

17. Painting

6. Plumbing

12. Plumbing fixture installation

18. Touch up and cleaning

4. Do I need to have design ideas before I start the renovation process?
      Absolutely not; but it helps if you do. Your Free Design Consultation is meant to help generate ideas or work through the ones you already have.

5. What features should I plan to invest the most in for my new bathroom?
      Depending on your style and taste, the floor and wall tiles can be the most expensive. Other possibly considerable expenses are the fixtures and shower system.

6. What type of return on investment can I expect from remodeling my bathroom if I sell my home?
      Bathrooms typically get the best return on investment in a remodeled home. Many people actually make substantial money when investing in a bathroom remodeling project, whether it is for a mid-range or an upscale home.

7. Is re-glazing a bathtub a good solution to replacing the tub?
      Re-glazing is a great way to save money but it doesn’t last. The glaze begins to wear off within a few years – even three years depending on usage. Nothing really replaces the visual appeal of a brand new tub. If you want to do it right and are not limited by budget, replacing the tub is the best way to go.